男人行房一般多久才算正常,做爰过程很黄口述细节,妈妈醉酒后把我当爸爸电视剧-妈妈醉酒后把我当爸爸电视剧,他的手攀向了我的高峰,韩国男按摩师吸乳房会得乳腺癌吗

Support

We have a trained and conscientious staff so that we can provide our customers with timely and appropriate responses.

  • What are the terms of payment ?

    L/C T/T M/T D/D

  • How long will the sample production cycle take ?

    1.Less weight products use international express delivery.
    2.Heavy products use shipping

  • How long will the sample production cycle take ?

    How long will the sample production cycle take ?

  • What are the processing methods ?

    cutting ,Turning processing,Milling processing,WEDM,grinding process,heat treatment processing,polishing and stretch .

  • What material can be processed ?

    Copper alloy ,aluminium ,Stainless steel (SUS303/SUS304/SUS420F) ,Gcr15,45# ,3Cr13 ,4Cr13 ,DSR7B and so on

  • What principle should be followed in the arrangement of machining sequence of CNC machining center?

    The arrangement of the processing sequence should be considered according to the structure of the parts and blank condition, as well as the need for positioning clamping, focusing on the rigidity of the workpiece is not destroyed. The order should generally follow the following principles:

    (1) The processing of the previous procedure shall not affect the positioning and clamping of the next procedure. The processing procedure of universal machine tool interspersed between them shall also be considered comprehensively.

    (2) Advance the machining sequence of the inner cavity, and then carry out the contour machining process.

    (3) It is best to connect with the same positioning, clamping method or the same knife processing process, in order to reduce the number of repeated positioning, the number of tool change and the number of moving plate.

    (4) In the same installation of multiple processes, should be arranged first to the workpiece rigid damage small process.

  • How to divide the process?

    The division of NC machining procedures can generally be carried out according to the following methods:


    (1) The tool sequence method is to divide the process according to the tool used, and finish all the parts that can be completed with the same tool. With a second knife and a third to do whatever else they can. This can reduce the number of tool change, compress the space time, reduce unnecessary positioning error.


    (2) For processing parts of the processing content of a lot of parts, according to the structural characteristics of the processing part into several parts, such as internal shape, shape, surface or plane. Generally first processing plane, positioning surface, after processing holes; First processing simple geometric shapes, then processing complex geometric shapes; First machining parts with low precision, and then machining parts with higher precision requirements.


    (3) For parts prone to processing deformation with rough and finish processing, due to deformation that may occur after rough processing and need to be calibrated, so generally speaking, where rough and finish processing should be separated.


    To sum up, in the division of the process, we must depend on the structure and technology of the parts, the function of the CNC machining center, the number of parts CNC processing content, the number of installation times and the flexible grasp of the production organization of the unit. It is also suggested that the principle of process concentration or the principle of process dispersion should be determined according to the actual situation, but it must strive to be reasonable.

  • In CNC machining center workpiece clamping way to determine the several aspects should pay attention to?

    The following three points should be paid attention to when determining the positioning datums and clamping schemes:


    (1) Strive to design, process, and programming calculation of the benchmark unity.


    (2) As far as possible to reduce the number of clamping, as far as possible after a positioning can be processed out of all the surface to be processed.


    3) Avoid using manual adjustment schemes.


    (4) The fixture should be open, its positioning, clamping mechanism can not affect the processing of the knife (such as collision), encounter this kind of situation, can be used with a vice or add the bottom plate to pull the screw clamping way.

Keep in touch

We are looking forward to your win-win cooperation Our main goal is to provide high quality services and customer satisfaction

Whatsapp
+86 15058771920
Email: export.stff@foxmail.com
ONLINE MESSAGE
stickpage| 极虎濛剪| 近地面大气的百榕精源| 美女被吸血鬼转化成吸血鬼| 《交换做爰》在线观看| 美洲预选赛| 濑名光 番号| 吾妻雅婷| 新版面皮| 宋婷婷京胡演奏视频全部视频合集| 少年英雄方世玉粤语| 蚂妈像花儿一样 电视剧| 央视6套在线直播| 趁女朋友洗澡C她闺蜜| Al+ Word| 竞吧啦你很有名小组| 逆转裁判1第三章| 妈妈的朋友8| 幸运13号战机高清完整免费理看| 犹豫就会败北| msteel插件| 父女一起到达巅峰的小说| 菠梦视频在线观看免费观看电视剧全集 | 太极拳二十四式教学视频完整版| 我的刑警朋友| 四级美语作文| 新时代中国特色社会主义思想的核心要义| 显卡功率对照表| 妈妈洗澡不把门关紧暗示什么| 福建舰航母最新消息| 《艳妻互换》完整版| 千杯不醉粤语| 我爱你再见电视剧全集在线播放| 植物大战僵尸杂交版通关| 新疆乌鲁木齐旅行社| 闰蜜比--视频|wk| 二人生猴子全程免费